Bulk Cashmere Orders
Volume changes what matters. On twenty pieces you worry about whether the sample is right. On two thousand you worry about consistency, scheduling, dye lots and what happens if one line runs late. This page covers how a bulk order is structured and where the risks actually sit.
How quantity is counted
Bulk is not one number. It is a grid, and the grid is what determines whether an order is efficient to make.
| Level | Minimum | What drives it |
|---|---|---|
| Per style | 20 pieces knitted; 50 woven | Machine or loom setup, pattern development, mending training |
| Per colour | 10 pieces woven; 20 knitted | Dye bath volume — a small bath is disproportionately expensive and less consistent |
| Per size | 5 pieces | Knitting programme change per size |
| Blankets | 5 pieces total, 1–3 per colour | Loom width and yarn quantity per piece |
A thousand pieces spread across forty styles in nine colours each is a harder order to produce well than a thousand pieces across six styles in four colours. If you can consolidate, you get better consistency and a cleaner schedule. If you cannot, say so early and we will build the schedule around it.
What changes as volume grows
| Area | Small order | Bulk order |
|---|---|---|
| Dyeing | Single bath per colour | Multiple baths — lot allocation and shade banding become an issue to manage deliberately |
| Scheduling | One production window | Staged production; lines can be released in phases if you need early stock |
| Inspection | Piece by piece | Sampled inspection against the sealed sample, with defined check points during production |
| Packing | Simple | Carton plans, packing lists, size and colour ratios per carton, barcode and labelling requirements |
| Shipping | Courier | Air freight or sea freight; documentation, certificate of origin, commercial invoice, packing list |
| Risk | One sample approval | In-line checks so that a problem is found at piece fifty, not piece nine hundred |
Consistency: the thing that actually goes wrong
Bulk failures are rarely dramatic. They are usually a shade drift between lots, a weight variance across a run, or a finishing difference that only shows when two pieces sit next to each other on a rail.
Shade
Where a colour needs more yarn than one dye bath holds, the colour will be dyed in more than one lot. The practical controls are: approve the lab dip physically, keep a retained swatch, ask for lots to be kept separate in packing so that a single retail delivery is from one lot, and set an acceptable tolerance in writing before production starts rather than arguing about it after.
Weight and dimension
Handwoven and hand-flat knitted goods carry natural variation. A featherlight stole specified at 72–95 g is a range, not a single figure, and that range is honest rather than evasive. Agree the tolerance at sample approval. A specification that says “90 g” with no tolerance is a specification that will be breached.
Finishing
Washing, pressing, fringe twisting and mending are hand operations. Consistency comes from the same people doing the same job through a run, which is one practical argument for consolidating a style into a single production window rather than splitting it across months.
Quality control through the run
| Check point | What is verified |
|---|---|
| Yarn intake | Composition, count, ply and colour against the approved lab dip |
| First off the machine or loom | Dimensions, weight, density and construction against the sealed sample — before the run continues |
| In-line | Periodic checks during the run for drift in tension, weight or shade |
| After finishing | Handle, dimensional stability after wash, pilling behaviour, fringe and edge finish |
| Mending | Dropped stitches, holes, weaving faults corrected by hand |
| Final | Count, labelling, packing, carton contents against the packing list |
Repeat production
A repeat order should be the easy one. It usually is not, because the specification that produced the first run was never written down properly.
- Keep the sealed sample. It is the reference. Store it away from light.
- Keep the approved lab dip for every colour you intend to repeat.
- Record the technical sheet — yarn count, ply, gauge or reed, dimensions before and after wash, weight, finishing sequence.
- Reference the original order number when you reorder, so the same recipe and construction are pulled rather than rebuilt.
- Expect a commercial match on colour, not an identical one. Plan merchandising accordingly.
Scheduling a bulk order backwards
| Working back from | Allow |
|---|---|
| Goods on your shelf | — |
| Customs clearance and inland delivery | Varies by country; build in a buffer |
| Freight | Air is days; sea is weeks. Decide early — it changes the whole calendar |
| Production | 45–60 working days from confirmed order and approved sample |
| Sample approval and corrections | Allow for at least one correction round |
| Development sample | 30–45 days for a new style |
| Brief and feasibility | A few days |
For a new style delivered by sea, five to six months is a comfortable calendar. Existing constructions in new colours compress that considerably, because development drops out.
Commercial terms
| Item | Standard |
|---|---|
| Payment | 50% advance on order confirmation, 50% before dispatch |
| Sampling | 2× unit cost, payable 100% in advance |
| Development sample | 30–45 days, 100% advance |
| Production | 45–60 working days |
| Pricing basis | Ex-works or FOB Kathmandu; freight, duties and taxes to consignee |
| Rejection tolerance | Up to 5% |
Further reading
- Wholesale cashmere
- Quality and specifications — the six-step inspection before you accept production
- Sampling — sealed samples and what they are for
- How we make cashmere
- Importing cashmere from Nepal
- How to choose a cashmere supplier
Discuss a bulk order
Send us the style and colour grid, your target delivery date and your market. We will tell you what is workable, what needs consolidating and what the realistic calendar is.