Custom cashmere development from Nepal
Bring us a design, a reference piece or just an idea. As cashmere specialists, we develop it into a sample, refine it with you, and have it produced under your label by trusted partner workshops in Kathmandu — at 50 pieces per style and colour, in 45–60 working days after approval.

What we can make
| Category | Construction | Notes |
|---|---|---|
| Scarves, stoles, shawls, wraps | Woven | Widths 20–250 cm; plain, check, stripe, jacquard, reversible |
| Sweaters, knit scarves, accessories | Knitted | Hand-flat and machine knitting across gauges |
| Blankets and throws | Woven or knitted | Reversible and two-tone options |
| Cashmere-silk | Woven | Typically 70/30 |
| Printed pieces | Screen or digital | To your artwork — see printing |
See the full range and specifications.
From brief to dispatch
- Brief. Use the project planner or send a tech pack, reference or sketch.
- Development sample. About 30–45 days, paid in advance. How sampling works.
- Approval. You approve colour, size, weight and hand-feel; the approved piece becomes the production standard.
- Production. 45–60 working days. 50% to start, 50% before dispatch.
- Quality control. Every piece checked against the approved sample and hand-mended where needed; 5% rejection tolerance.
- Dispatch. Ex-works or FOB Kathmandu, labelled and packed to your instructions.


Who this is for
Fashion brands developing a cashmere line · private-label collections · boutiques wanting their own colours · corporate gifting · bulk orders.
Buyer questions
What is the minimum for custom cashmere?
50 pieces per style and colour as standard. Smaller projects are reviewed individually through the custom quantity form.
How are samples charged?
Samples of existing constructions are charged at 2× unit cost and deducted from the bulk order under the agreed terms. Development samples are quoted per project and paid in advance.
Can you work from a reference product?
Yes. Send the piece or detailed photos and measurements; we match the construction and advise where a change would improve it.
Start your cashmere project
Standard minimum: 50 pieces per style and colour. Production takes 45–60 working days after sample approval. Sampling is charged at 2× unit cost and deducted from the bulk order under the agreed terms.